바로가기 메뉴
메인메뉴 바로가기

logo

  • HOME
  • SITEMAP
  • Company
    • CEO message
    • Vision
    • History
    • Organization
    • Main Customers
    • Contact Us
  • Business Scopes
    • Agency
    • Cargo Forwarding
    • Marine Survey
    • Ship Management
    • Business Consultation
  • Port Information
    • Port Directory
    • China Port Congestion
    • Port Gallery
  • Regulation
    • Shipping Regulation
  • News
    • China shipping information
    • General Economy
  • Notice
    • General Information
  • Q/A

Port Information

  • Port Directory
  • 항만책자
  • China Port Congestion
  • Iron Ore / General Cargo
  • Log
  • Vlcc Tanker
  • Port Gallery

Directory Book

> Port Information > Directory Book

Item Content
Port Name WENZHOU
Port Location 28-02-00N, 120-39-00E
Pilotage Pilot Station Same as Anchorage
VHF call Port Control - CH16, Pilot Station - CH16 Radio Station - CH16, Agent - CH73
Pilot Service Daytime only
Anchorage Anchorage HUANGDAO
Position 27-56-07N
Depth 8
Bottom MUD
Capacity 10
Purpose QUARANTINE WAITING FOR PILOT
Anchorage Anchorage OUTSIDE OF HUANGDA’AO
Position 27-56-30N
Depth 15
Bottom SAND
Capacity 000
Purpose WAITING FOR PILOT
Item Content
Port Name WENZHOU
Channel Depth Huangda’ao p/stn to Longwan terminal : Max draft 8.5 M F.W Longwan terminal to Yangfushan terminal : Max draft 5.5 F.W Yangfushan terminal to Liuao terminal : Max draft 4.2M F.W Yuanyu anchorage to Zhuang‘yuan’ao terminal : Max draft 11.30M F.W
Air Draft 29.5M ( if vsl procced to Yangfushan wharf.) 19M (if vsl procced to Liuao wharf)
Tug Details 3 X 3,400HP, 3 X 600HP
Production Liquided Chemiclal :100-200t/hr, LPG: 100 - 500t/h Wire Rod : 500-750mt/gang/day, S.Coil : 1,200-2,000mt/day Resin : 500-750mt/gang/day, Stone(Pyrophyllite) : 3,000mt/day Coal/nickel :15000-18000mt/day
Main Cargo Import General Cargo, LPG, LIQUIDED CHEMICAL,ASPHALT,COAL,NICKEL ORE
Export PYROPHYLLITE, STEEL PRODUCTS
Port Service Bunker ONLY MGO Available at berth,but too expensive
Crew Change Available (but expense very high)
Fresh Water Available,but too expensive
Restriction Draft < 9M, LOA < 180M, BEAM < 36M, DWT < 10,000MT Liuao Wharf Draft < 4.2M AIR DRAFT 19MTS, DWT < 1000MT
Port Name WENZHOU
Berth Name Berth No Length Depth Capacity Purpose Facility
LONGWAN / 425 8 10000 CONTAINER SHORE CRANE 2 X 30T SHORE CRANE 3 X 10T TRUCK CRANE 1 X 100T
ZHUANGYUAN AO / 650 17.8 0 BULK CARGO SHORE CRANE 1X16T
QILI / 586 11 15000 MULTI-PURPOSE 2X25T 1X40T BRIDGE CRANE 3X40T
QILI / 586 11 25000 CONTAINER SHORE CRANE 2 X 40T BRIDGE CRANE 2 X 35T
QILI / 586 11 25000 BULK CARGO SHORE CRANE 2 X 40T BRIDGE CRANE 2 X 35T
LONGDONG OIL / 70 5 3000 LIQUID PETROCHEMICAL /
LIUAO / 45 4 1000 ASPHALT /
XIAOMENDAO / 76 11.5 50000 LPG /