Port Name | NINGBO | |
Port Location | NINGBO 29-53-65N, 121-34-22E BEILUN 29-56-29N, 121-53-05E ZHENHAI 29-57-00N, 121-43-00E | |
Pilotage | Pilot Station | 29-59-18N, 121-46-30E, 30-02-30N, 121-48-12E |
VHF call | Pilot - CH16/09 Port Control - CH16/09 | |
Pilot Service | 1) Qiliyu Anchorage and Jintang Anchorage : 24hours available 2) Xiashi Anchorage : available at day time only | |
Anchorage | Anchorage | BEILUN |
Position | 121 52 00E | |
Depth | 20 | |
Bottom | MUD | |
Capacity | 300 | |
Purpose | CARGO OPERATION | |
Anchorage | Anchorage | QILI |
Position | 29 58 00N | |
Depth | 9 | |
Bottom | MUD | |
Capacity | 000 | |
Purpose | WAITING FOR PILOT | |
Anchorage | Anchorage | JINTANG |
Position | 121-46.5E | |
Depth | 13.4 | |
Bottom | MUD&SAND | |
Capacity | 5 | |
Purpose | WAITING FOR PILOT | |
Anchorage | Anchorage | XIAZHIMEN |
Position | 30-00.3N 121-47.5E | |
Depth | 18.2 | |
Bottom | MUD | |
Capacity | 000 | |
Purpose | WAITING FOR PILOT |
Port Name | NINGBO | |
Channel Depth | South Channel : 20 M, North Channel: 8 M | |
Air Draft | 31M for Ningbo No.3 Stevedore Berth | |
Tug Details | 1 X 980HP, 5 X 3200HP, 2 X 3600HP, 1 X 3400HP 3 X 4200HP, 1 X 5200HP, 1 X 2600HP, 5 X 4800HP | |
Production | S. Coil : 2,000mt/SHIFT, Iron Ore : 10,000mt/crane/day PTA : 1000mt/gang/SHIFT, Paper Pulp : 2,000-2,500mt/gang/day Logs : 1,000-2,000mt/day, Cement : 1,500-2,000mt/gang/day S.Pipe : 2,000mt/day, Fertilizer : 1,500-2,000mt/gang/day Deformed Bar : 4,000mt/day, Barley : 1,500-1,800mt/gang/day Pet Cock : 2,500-3,000mt/gang/day Fluorite : 3,000mt/day (Bulk) 4,500mt/day (Bag) Steel Plate (Samsun Berth) : 1,000-1,500mt/day Petrochemical Product(Liquid) : 6,000mt/day | |
Main Cargo | Import | / |
Export | / | |
Port Service | Bunker | Available at Anchorage and Berth (not available for liquid chemical/oil) |
Crew Change | Available via Ningbo Immigrantion | |
Fresh Water | Available at Anchorage and Berth **not available at daxie shihua terminal. | |
Restriction | - Night Time Berthing and deberthing is permitted in Beilun and Zhenhai as per suitable tide, but not permitted in Ningbo no.3 stevedores port area,Daxie Shihua Crude Oil and Suanshan Crude Oil - For berthing at Ningbo No.3 Stevedore Berth, Vessel should pass Zhaobaoshan Bridge which air draft is 31M. |
Berth No | Length | Depth | Capacity | Purpose | ||
---|---|---|---|---|---|---|
NINGBONO.3 STEVEDORAGE AIR DFT < 31M | NO.1-4 | 110 | 5.8 | 3000 | GENERAL CARGO | SHORE CRANE 3 X 5T SHORE CRANE 4 X 4T SHORE CRANE 1 X 20T |
NINGBONO.3 STEVEDORAGE AIR DFT < 31M | NO.4-8 | 110 | 5.8 | 3000 | GENERAL CARGO | SHORE CRANE 3 X 5T SHORE CRANE 4 X 4T SHORE CRANE 1 X 20T |
NINGBONO.3 STEVEDORAGE AIR DFT < 31M | NO.8-12 | 110 | 5.8 | 3000 | GENERAL CARGO | SHORE CRANE 3 X 5T SHORE CRANE 4 X 4T SHORE CRANE 1 X 20T |
ZHENHAI PUBLIC TERMINAL | NO.1 | 130 | 5.14 | 3000 | COAL(DOMESTIC) | LOADER 1 X 1000T/H |
ZHENHAI PUBLIC TERMINAL | NO.2 | 180 | 9.2 | 10000 | COAL(DOMESTIC) | SHORE CRANE 5 X 10T |
ZHENHAI PUBLIC TERMINAL | NO.3 | 170 | 7.24 | 10000 | COAL(DOMESTIC) | SHORE CRANE 5 X 10T |
ZHENHAI PUBLIC TERMINAL | NO.4 | 140 | 8.11 | 10000 | GENERAL CARGO | SHORE CRANE 2 X 10T SHORE CRANE 1 X 30T |
ZHENHAI PUBLIC TERMINAL | NO.5 | 180 | 8.06 | 10000 | CONTAINER | SHORE CRANE 1 X 30T |
ZHENHAI PUBLIC TERMINAL | NO.6 | 180 | 7.17 | 10000 | CONTAINER | SHORE CRANE 1 X 40T |
ZHENHAI PUBLIC TERMINAL | NO.7 | 120 | 5.23 | 5000 | GENERAL CARGO (DOMESTIC) | / |
ZHENHAI PUBLIC TERMINAL | NO.8 | 120 | 5.23 | 5000 | LIQUIDCHEMICAL (ASPHALT) | / |
ZHENHAI PUBLIC TERMINAL | NO.9 | 180 | 9.5 | 10000 | GENERAL CARGO | BRIDGE CRANE 3 X 10T |
ZHENHAI PUBLIC TERMINAL | NO.10 | 280 | 9 | 20000 | GENERALCARGO (DOMESTIC) | SHORE CRANE 4 X 10T |
ZHENHAI PUBLIC TERMINAL | NO.13 | 148 | 7 | 5000 | LIQUID CHEMICAL | HOSE 2 X 125T/H |
ZHENHAI PUBLIC TERMINAL | NO.14 | 180 | 7 | 5000 | LIQUID CHEMICAL | HOSE 2 X 125T/H |
ZHENHAI PUBLIC TERMINAL | NO.16 | 190 | 9 | 10000 | LIQUID CHEMICAL | HOSE 2 X 125T/H |
ZHENHAI PUBLIC TERMINAL | NO.17 | 349 | 14 | 50000 | LIQUID CHEMICAL | HOSE 2 X 125T/H |
ZHENHAI PUBLIC TERMINAL | NO.18 | 340 | 14 | 50000 | LIQUID CHEMICAL | HOSE 2 X 125T/H |
BEILUN 1ST STAGE | NO.1 | 351 | 18.2 | 100000 | COAL | DISHCHARGER 2 X 2100T/H |
BEILUN 1ST STAGE | NO.2 | 360 | 20.5 | 200000 | IRON ORE | DISHCHARGER 2 X 2100T/H |
BEILUN 1ST STAGE | NO.3 | 650 | 12 | 30000 | ORE (DOMESTIC) | LOADER 3 X 4200T/H |
BEILUN 1ST STAGEBEILUN 1ST STAGE | NO.4 | 650 | 12 | 30000 | ORE (DOMESTIC) | LOADER 3 X 4200T/H |
BEILUN 1ST STAGE | NO.5 | 650 | 12 | 30000 | ORE (DOMESTIC) | LOADER 3 X 4200T/H |
BEILUN 1ST STAGE | NO.6 | 360 | 13.5 | 50000 | BULK CARGO FERTILIZER | SHORE CRANE 2 X 16T SHORE CRANE 1 X 30T |
BEILUN 2ND STAGE | NO.1 | 414 | 12.5 | 50000 | COAL (DOMESTIC) | SHORE CRANE 6 X 10T |
BEILUN 2ND STAGE | NO.2 | 414 | 12.5 | 50000 | COAL | SHORE CRANE 6 X 10T |
BEILUN 2ND STAGE | NO.3 | 900 | 12.5 | 50000 | CONTAINER | SHORE CRANE 2 X 16T GANTRY CRANE 2 X 35T BRIDGE CRANE 4 X 45T BRIDGE CRAME 2 X 50T |
BEILUN 2ND STAGE | NO.4 | 900 | 12.5 | 50000 | CONTAINER | SHORE CRANE 2 X 16T GANTRY CRANE 2 X 35T BRIDGE CRANE 4 X 45T BRIDGE CRAME 2 X 50T |
BEILUN 2ND STAGE | NO.5 | 900 | 12.5 | 50000 | CONTAINER | SHORE CRANE 2 X 16T GANTRY CRANE 2 X 35T BRIDGE CRANE 4 X 45T BRIDGE CRAME 2 X 50T |
BEILUN 2ND STAGE | NO.6 | 900 | 12.5 | 50000 | CONTAINER | SHORE CRANE 2 X 16T GANTRY CRANE 2 X 35T BRIDGE CRANE 4 X 45T BRIDGE CRAME 2 X 50T |
BEILUN 3RD STAGE | NO.1 | 1238 | 14 | 50000 | CONTAINER | BRIDGE CRANE 4 X 60T |
BEILUN 3RD STAGE | NO.2 | 1238 | 14 | 50000 | CONTAINER | BRIDGE CRANE 4 X 60T |
SINOPEC ZHENHAI | NO.1 | 510 | 20.5 | 250000 | CRUDE OIL | LOADING ARM 4 X 16' |
SINOPEC ZHENHAI | NO.2 | 305 | 13 | 50000 | CRD/PRDCT OIL | LOADING ARM 4 X 12' |
SINOPEC ZHENHAI | NO.3 | 305 | 13 | 50000 | CRD/PRDCT OIL | LOADING ARM 4 X 12' |
SINOPEC ZHENHAI | NO.4 | 93 | 8 | 3000 | PRODUCT OIL | LOADING ARM 4 X 6' |
SINOPEC ZHENHAI | NO.5 | 177 | 10 | 5000 | PRODUCT OIL | LOADING ARM 4 X 6' |
DAXIE JIXIN TERMINAL | / | 240 | 10.5 | 25000 | GENERAL CGO | SHORE CRANE 1X40MT SHORE CRANE 2X10MT SHORE CRANE 1X50MT SHORE CRANE 1X25MT |
CHINTAI CEREAL OIL | / | 250 | 12.5 | 40000 | EDIBLE OIL | / |
ESSO | / | 360 | 13.5 | 50000 | OIL PRODUCT | LOADING ARM 1 X 10' LOADING ARM 3 X 6' |
SHINING GOLD | / | 250 | 14 | 50000 | GRAIN | SHORE CRANE 2 X 8T SUCKER 1 X 800T/H SUCKER 1 X 200T/H |
CHINTAI CEREAL OIL | / | 250 | 12.5 | 40000 | G'CARGO | / |
CONCH CEMENT | / | 170 | 10.5 | 7000 | CEMENT IN BULK | / |
ZHENGDA OIL&CEREAL | / | 250 | 12.5 | 40000 | EDIBLE OIL | / |
LNG PORT | / | 100 | 5 | 3000 | L.N.G | HOSE 2 X 6' |
SAMSUNG PORT | / | 100 | 5 | 5000 | HEAVY LIFT | SHORE CRANE 1 X 150T |
SINO CHEM CRUDE OIL PORT | FINISHED OIL PORT | 360 | 13.5 | 50000 | FINISHED OIL | HOSE 1 X 10' HOSE 3 X 6' |
SINO CHEM CRUDE OIL PORT | L.N.G | 82 | 6 | 3000 | L.N.G | HOSE 1 X 6' |
ELECTRIC PLANT PORT | COAL | 274 | 13 | 50000 | COAL | UNLOADER 2 X 1500T/H |
ELECTRIC PLANT PORT | HEAVY LIFT | 170 | 6 | 5000 | HEAVY LIFT | SHORE CRANE 1 X 400T |